The Basement - Before
We have hired a contractor to finish our basement. Paul Lemieux Construction will begin the work on July 16th. Here are some before pictures.
Taken from in front of the sliding glass windows, looking at the stairs/furnace.
taken from the same spot, just looking to the left at the fuse box.
Taken from the fuse box looking back towards the sliders.
Taken from the left of the stairs looking towards the back yard. Where I am standing is probably where the bathtub will be.
Taken directly next to the water heater looking across the basement.
Another taken from nearly the same spot as the first picture.